Foundations dug out to minimum 600mm. Concrete poured.Engineering bricks & blocks partially laid to “floor” level.Bricks & blocks laid to “floor” level. Hard core levelled out and whacked down. Builder’s sand “blinding” layer spread out and whacked down.Damp proof membrane put in place.Concrete “oversight” layer added on top of membrane.